Home / Projects / Urban planning / PARKING PLACE DES ALLIÉS

PARKING PLACE DES ALLIÉS

Differdange, Luxembourg, Europe

Sector Urban planning
Client Administration Communale de Differdange, 40, avenue Charlotte, Differdange, LU
Architect Dewey Muller, 4, Flandrische Straße, 50674 Köln, DE
Intervention Construction
Scope Study and following up MEP
GFA 5,300 m2
Project status completed
Study May 2011 - October 2012
Execution April 2013 - July 2015

Sustainable Features

CHP
CHP
heat recovery
heat recovery
water management
water management
natural ventilation
natural ventilation

Total technical installations cost: € 725.000,00 excl. VAT

Total construction cost: € 6.512.100,00 excl. VAT

 

“Place des Alliés” was transformed into an ideal meeting place for locals; a nice place to meet, chat, visit a market or throw a party, complete with a large underground public car park for 180 parking spaces, keeping the upper level of the square free from cars.

 

The project includes the following technical installations:

  • an integral sprinkler system
  • a network of fire hydrants
  • Mechanical ventilation with an air extraction unit perfectly integrated with the concept of the square
  • LED lighting for the interior car park
  • outdoor lighting of the square on light masts
  • a hydrocarbon separator for wastewater
  • two energy terminals on the square