Home / Projects / Health Care / RENOVATION AND CONSTRUCTION OF VARIOUS HOSPITAL WARDS ON THE CAMPUS OF ST. ELISABETH HOSPITAL

RENOVATION AND CONSTRUCTION OF VARIOUS HOSPITAL WARDS ON THE CAMPUS OF ST. ELISABETH HOSPITAL

Turnhout, Belgium, Europe

Sector Health Care
Client AZ Turnhout, Steenweg op Merksplas 44, 2300 Turnhout, BE; Campus Sint-Elisabeth, Rubensstraat 166, 2300 Turnhout, BE
Architect Osar Architects nv, Jan Van Rijswijcklaan 162 bus 10, 2020 Antwerpen, BE
Intervention New construction and Renovation
Scope Study and following up MEP
GFA 42,000 m2
Project status completed
Study June 2005 - December 2010
Execution July 2007 - December 2017

Sustainable Features

water management
water management
heat recovery
heat recovery
passive cooling
passive cooling
glazing
glazing

Client: AZ Turnhout, Steenweg op Merksplas 44, 2300 Turnhout, BE; Campus Sint-Elisabeth, Rubensstraat 166, 2300 Turnhout, BE

Total technical installation cost: 26.639.897,63 € excl. vat

Total construction cost: 52.200.000,00 € excl. vat

Surface: 42.000 m² (all buildings)

 

Renovation and new construction of the following on the campus of St Elisabeth in Turnhout:

  1. renovation of the following departments/wards of the existing St Elisabeth Hospital:
    • Renovation of intensive care ward and its nursing station
    • New oncology ward
    • Renovation of  the emergency department including the X ray room
    • New parking tower
    • Temporary lab
    • Medical imaging/radiology department
    • Linear Accelerator
    • Renovation of the hospital pharmacy
    • New CAD room
    • New audio spectrometry cabin

 

  1. New medical consultation building to accommodate patient visits with medical professionals
  2. New nursing home care facility ‘De Wending’

 

Hospital:

The existing hospital buildings dating back to the 50s were in need of renovation or replacement. 2 hospital wings were renovated for the creation of 369 beds. Each patient room is equipped with a bathroom (toilet, sink and shower) and a mediacom terminal, wherein the patient has the ability to make phone calls, watch TV and surf the internet. The rooms are also equipped with a nurse call system by the bed and in the bathroom. Rooms along the south side are equipped with external electric blinds. 

On the site is a geothermal HCS (hot cold storage) system using aquifers. The HCS system ensures minimum consumption of the primary energy source.  These underground aquifers also passively provide chilled water for cooling to the entire operation ward and cooling for the heating batteries of the air handling units.

A new linear accelerator was installed with accompanying doctor consultation rooms and reception area. For the effective operation of the particle accelerator, a separate air group, equipped with temperature and humidity control, guarantees a constant controlled climate.

 

Medical Consultation Building:

New 5 story medical consultation building to accommodate patient visits with medical professionals

The 5 building levels are each equipped with thermally-activated concrete floor slabs, in combination with fan coils fitted at the periphery of each floor. Generation of both heating and cooling is carried out by a heat pump connected to an open-well ground-source heat exchanger. This is the second such installation on the site.

 

Nursing Home Care Facility:

Construction of the nursing home facility