Home / Projects / Health Care / ‘Ter Heide’ day care center and 4 houses

‘Ter Heide’ day care center and 4 houses

Genk, Belgium, Europe

Sector Health Care
Client De Intercommunale voor Gehandicaptenzorg Limburg – Ter Heide, Klotstraat 125, 3600 Genk, BE
Architect Dierendonckblancke Architecten, Nederkouter 111, 9000 Gent, BE
Intervention Construction
Scope Study and following up MEP / EPBD reporting
GFA 3,884 m2
Project status completed
Study March 2016 - October 2016
Execution November 2017 - October 2019

Sustainable Features

reuse rainwater
reuse rainwater
green roof
green roof
heat recovery
heat recovery
solar energy
solar energy
geothermal energy
geothermal energy
passive cooling
passive cooling
glazing
glazing
Total technical installations cost:€ 2.873.917,20 VAT excluded
Total construction cost:€ 8.366.405,10 VAT excluded
K Level / Energy class :28-31

 

Project description:

Ter Heide is a residential community for children and adults with multiple disabilities.

They have at their disposal a green domain with all facilities for living, daily activities, treatment, support and recreation.

In several phases the existing buildings are replaced with a day care center and 4 houses for 10 residents each.

boydens engineering was responsible for the complete technical installation (heating, ventilation, plumbing and electricity) of the houses and the infrastructure works on site.

For heating of the houses, heat pumps linked to a borehole energy storage field are applied.

The heat pumps, boilers, buffer tanks, sanitary hot water preparation and descaler are all housed in one central technical room.

The houses are ventilated by an air handling unit with heat recovery per house.

Due to the special needs and vulnerability of the residents, the living spaces and rooms are equipped with underfloor heating and shielded convectors, a sanitary cell, nurse call system and camera surveillance if demanded by the resident’s profile.