Total technical installations cost: | 86.207,50 € VAT excluded |
Total construction cost: | 1.829.248,00 € VAT excluded |
K Level: | – |
E Level: | – |
Certification: | – |
Project description:
On the ‘Groenhagemolen’ site in Leffinge, the existing house and bakery have been restored. The house is used as a reception area for visitors of the the mill and bakery, but can also be hired and used as a one of a kind unique meeting room.
The building is heated by a condensing boiler in combination with radiators with thermostatic faucets. A ventilation system type D with heat recovery via a cross-flow heat exchanger assures a healthy and comfortable indoor climate: top cooling in the summer periods can be used via the air handling unit that was added in the technical room on the first floor.
To lift the building to a higher level in terms of sustainability, the rainwater is reused for the toilets and all lighting is LED in order to limit electricity consumption.